From jcirtain@cfa.harvard.edu Mon Jun 6 22:04:19 2005 Date: Mon, 6 Jun 2005 22:04:16 -0400 From: Jonathan Cirtain To: golub@head.cfa.harvard.edu, Ed DeLuca , mweber@head.cfa.harvard.edu, bookbind@head.cfa.harvard.edu Subject: E2E 20050606 shift A report The CCD was cooled to operating temperatures. Testing should commenced about 13:30 CDT today. All of the test data to determine the focal length will be collected during shift B. Please refer to that page for all further information. The link is:Shift B We did collect first light images and determined that there was a 4 pixel shift in positive x when the FAM was turned on due to a smal change in the encoder positions. We also were able to determine that a 16 second exposure was appropriate for the tests and was well below the saturation limit. Jonathan